ABB System Integrator

ABB system integrator

ABB system integrator
  • Active power filter PQF Active power filter

    Active power filter PQF

    Harmonic control for different occasions

    View DetailsActive power filter PQF Active power filter产品详情
  • New generation active power filter PQactiF New generation active power filter

    New generation active power filter PQactiF

    Infinitely reactive power compensation for inductive and capacitive loads is possible

    View DetailsNew generation active power filter PQactiF New generation active power filter产品详情
  • Inductive generator for hybrid compensation PQflexC Inductive generator for hybrid compensation

    Inductive generator for hybrid compensation

    It can form a capacitor cabinet with a capacitor bank to realize stepless power factor control

    View DetailsInductive generator for hybrid compensation PQflexC Inductive generator for hybrid compensation产品详情
BOWO Smart Power Energy Integration
Solution Provider
  • Telephone
    010-60775517
  • Email
    zxn@dfpower.com.cn
  • Headquarters Address
    A208, Building A, Xinyuan Technology Park, No.97 Changping Road
    Shahe Town, Changping District, Beijing
  • Factory Address
    Buildings 7 and 8, North Area of Xinyuan Technology Park
    Machikou Town, Changping District, Beijing
  • 提交成功

    我们将尽快与您取得联系
    关闭
    我们将尽快与您取得联系
    关闭
    Purchase 010-60775517 13911318361 zxn@dfpower.com.cn

    I want to purchase